Abstract
PreviewThis document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).
Designs and details for new road bridges address structural integrity by considering the following:
— the use of continuity and redundancy to provide one or more alternate paths;
— structural members and bearing seat widths that are resistant to damage or instability; and
— external protection systems to minimize the effects of reasonably conceived severe loads.
-
Status: PublishedPublication date: 2021-11
-
Edition: 1Number of pages: 83
Buy this standard
Format | Language | |
---|---|---|
std 1 208 | PDF + ePub | |
std 2 208 | Paper |
- CHF208
Life cycle
Got a question?
Check out our FAQs
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)
Keep up to date with ISO
Sign up to our newsletter for the latest news, views and product information.