Résumé
ISO 7870-3:2012 gives guidance on the uses of acceptance control charts and establishes general procedures for determining sample sizes, action limits and decision criteria. This chart should be used only when: a) the within subgroup variation is in-control and the variation is estimated efficiently; b) a high level of process capability has been achieved.
This chart is typically used when the process variable under study is normally distributed, however, it can be applied to a non-normal distribution. Examples are included to illustrate a variety of circumstances in which this technique has advantages and to provide details of the determination of the sample size, the action limits and the decision criteria.
Informations générales
-
État actuel: AnnuléeDate de publication: 2012-03Stade: Annulation de la Norme internationale [95.99]
-
Edition: 1
-
Comité technique :ISO/TC 69/SC 4ICS :03.120.30
- RSS mises à jour
Cycle de vie
-
Précédemment
AnnuléeISO 7966:1993
-
Actuellement
-
Révisée par
PubliéeISO 7870-3:2020