Тезис
This document specifies general requirements and recommendations for the design and assessment of bottom-founded (fixed) and buoyant (floating) offshore structures.
This document is applicable for all phases of the life of the structure, including:
— successive stages of construction (i.e. fabrication, transportation, and installation),
— service in-place, both during design life and during any life extensions, and
— decommissioning, and removal.
This document contains general requirements and recommendations for both the design of new build structures and for the structural integrity management and assessment of existing structures.
This document does not apply to subsea and riser systems or pipeline systems.
Общая информация
-
Текущий статус: ОпубликованоДата публикации: 2019-06Этап: Рассылка краткого отчета о пересмотре [90.60]
-
Версия: 3
-
Технический комитет :ISO/TC 67/SC 7ICS :75.180.10
- RSS обновления
Жизненный цикл
-
Ранее
ОтозваноISO 19900:2013
-
Сейчас
ОпубликованоISO 19900:2019
Стандарт, который пересматривается каждые 5 лет
Этап: 90.60 (Hа стадии пересмотра)-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00